First Canadian Place

The tallest occupied building in Canada gets a face lift. Due to weathering, all the limestone fa├žade panels on the building were replaced with a new glass curtain wall. The platform system rode up and down on the window washing tracks, anchored to the building spandrel beams and allowed demolition on one level and installation on another. The platform was served by two hoist complexes from a podium level and one hoist complex from the street.

Project Type:

Scaffold & Access

Categories:

Construction Access

Reach Out to Us

Our Office

475 Veit Road
Huntingdon Valley, PA, 19006, USA

Contact Us

p: 215.638.0767
f: 215.638.0787
info@planbengineering.com

Follow Us

LinkedIn